| Title | Date of Issue | Last Date For Submission | Extended Date | Download Pdf Document |
|---|---|---|---|---|
| Design, Manufacturing, Supply, Erection, Testing and Commissioning of Dynamic Reactive Power Compensation Panel with Hybrid Solution | 25.07.2020 | 13.08.2020 | Download |
| Title | Date of Issue | Last Date For Submission | Extended Date | Download Pdf Document |
|---|---|---|---|---|
| Design, Manufacturing, Supply, Erection, Testing and Commissioning of Dynamic Reactive Power Compensation Panel with Hybrid Solution | 25.07.2020 | 13.08.2020 | Download |