Title | Date of Issue | Last Date For Submission | Extended Date | Download Pdf Document |
---|---|---|---|---|
Expression of Interest for Design, Engineering, Supply, erection, installation, testing and commissioning of dynamic reactive power compensation panel with hybrid solution for 20T Electric Arc Furnace and Ladle Refining Furnace | 14/08/2020 | 15/09/2020 | 29.09.2020@10:30 Hr | Download |